
Our static requirements are type-certified by TÜV and based on stringent conditions, such as the wind load as per DIN 1055, and the latest standards, such as Section 79 of the Building Regulations (Bauordnung). In the case of constructions for short-term use (temporary buildings), it is possible to perform assembly immediately, using a simplified licensing procedure. If the structure is intended for long-term use, the local building authority should be consulted to ascertain whether a building permit is necessary.
Depending on the building procedure employed, we will of course supply you with the necessary documentation, such as inspection records or approved statics in the required form.
Corrosion? No need to be afraid of that.
The extruded aluminium bracing profiles with hot-dip-galvanised steel components that we use are able to withstand all moisture.
Problems in winter? Not with our tents halls. All our standard halls come with a TÜV-inspected statics report complete with construction record. The tents are designed for a snow load of 25 up to 135 kg/m².
Thanks to the use of diagonal wall/roof braces together with the tent hall frame.
The use of grid elements makes it possible cheaply and simply to expand the tent dimensions according to requirements.
Is there anything else you would like to know? We make asking questions easy – and we call you back.
Callback
Would you like us to make you a detailed offer? No problem, we can send you one right away.
Online Enquiry
If you would like to find out more about us, you can download our brochure in PDF format.
Download Brochure
Do you wish to contact us directly? Here is all the information you need.
Contact